User:EvilJackCarver/sandbox: Difference between revisions
Jump to navigation
Jump to search
m (Add nonprinting comment about copying. Remove bullet points until I get confirmation whether that's correct or not.) |
(Page wiped, it's now a preflight checklist) |
||
Line 1: | Line 1: | ||
<!-- Hi there, if you're planning on copying this over | <!-- Hi there, if you're planning on copying this over somewhere, just hit Ctrl-A in this field, copy it, and paste it in over the other file there. You don't even have to delete this comment if you don't want to - it won't show. | ||
VERIFY THE INFORMATION BELOW IS ALL ACCURATE PRIOR TO COPYING OVER! ---> | VERIFY THE INFORMATION BELOW IS ALL ACCURATE PRIOR TO COPYING OVER! ---> | ||
=Pre-flight checklist= | |||
==Command division== | |||
=== | ===Bridge=== | ||
* Get Centcomm mission briefing | |||
* Ensure engineering is ready | |||
* Coordinate with WO about battle plans | |||
* Figure out a salvage team, if possible | |||
==Engineering division== | |||
===Engineering=== | |||
* FTL and shield gen plasma wrenched down, relevant valves open | |||
* TEG should be producing power. ''The supermatter does not strictly need to be on, but you do need to be making power'' | |||
===Atmos=== | |||
* Atmos gas filters and mixer maxed | |||
* Airmix tank outlet regulator set 5066 kPa, master distro pump at no higher than 400 kPa to reduce airloss | |||
* Volume pump on master waste inlet, maxed. | |||
* '''''Optional:''''' Heater-freezer on master waste line by the inlet, to cool incoming waste gases so it filters quicker. | |||
* Air alarms in engineering and common areas set to Contaminated. | |||
** This is the same as setting the air scrubbers to scrub out all harmful gases, it's just easier. | |||
* Porta-pump dock added to air-to-mix pipe in Atmos | |||
Revision as of 16:34, 21 November 2016
Pre-flight checklist
Command division
Bridge
- Get Centcomm mission briefing
- Ensure engineering is ready
- Coordinate with WO about battle plans
- Figure out a salvage team, if possible
Engineering division
Engineering
- FTL and shield gen plasma wrenched down, relevant valves open
- TEG should be producing power. The supermatter does not strictly need to be on, but you do need to be making power
Atmos
- Atmos gas filters and mixer maxed
- Airmix tank outlet regulator set 5066 kPa, master distro pump at no higher than 400 kPa to reduce airloss
- Volume pump on master waste inlet, maxed.
- Optional: Heater-freezer on master waste line by the inlet, to cool incoming waste gases so it filters quicker.
- Air alarms in engineering and common areas set to Contaminated.
- This is the same as setting the air scrubbers to scrub out all harmful gases, it's just easier.
- Porta-pump dock added to air-to-mix pipe in Atmos