User:EvilJackCarver/sandbox
Jump to navigation
Jump to search
Pre-flight checklist
Command division
Bridge
- Get Centcomm mission briefing
- Ensure engineering is ready
- Coordinate with WO about battle plans
- Figure out a salvage team, if possible
Engineering division
Engineering
- FTL and shield gen plasma wrenched down, relevant valves open
- TEG should be producing power. The supermatter does not strictly need to be on, but you do need to be making power
Atmos
- Atmos gas filters and mixer maxed
- Airmix tank outlet regulator set 5066 kPa, master distro pump at no higher than 400 kPa to reduce airloss
- Volume pump on master waste inlet, maxed.
- Optional: Heater-freezer on master waste line by the inlet, to cool incoming waste gases so it filters quicker.
- Air alarms in engineering and common areas set to Contaminated.
- This is the same as setting the air scrubbers to scrub out all harmful gases, it's just easier.
- Porta-pump dock added to air-to-mix pipe in Atmos