User:EvilJackCarver/sandbox

From FTL13
Revision as of 16:34, 21 November 2016 by EvilJackCarver (talk | contribs) (Page wiped, it's now a preflight checklist)
Jump to navigation Jump to search


Pre-flight checklist

Command division

Bridge

  • Get Centcomm mission briefing
  • Ensure engineering is ready
  • Coordinate with WO about battle plans
  • Figure out a salvage team, if possible

Engineering division

Engineering

  • FTL and shield gen plasma wrenched down, relevant valves open
  • TEG should be producing power. The supermatter does not strictly need to be on, but you do need to be making power

Atmos

  • Atmos gas filters and mixer maxed
  • Airmix tank outlet regulator set 5066 kPa, master distro pump at no higher than 400 kPa to reduce airloss
  • Volume pump on master waste inlet, maxed.
  • Optional: Heater-freezer on master waste line by the inlet, to cool incoming waste gases so it filters quicker.
  • Air alarms in engineering and common areas set to Contaminated.
    • This is the same as setting the air scrubbers to scrub out all harmful gases, it's just easier.
  • Porta-pump dock added to air-to-mix pipe in Atmos